Rectangular Carrier Bag - Green

Rectangular Carrier Bag - Green

87.00

Main parts: polypropylene
Handle: 100% polypropylene
Cord: 100% cotton
Exterior colour: green
Size: L 38 cm W 18 cm H 36 cm

 

Singular and versatile. The carrier bag has been designed to make your everyday life more stylish and comfortable. The design, inspired by glass blocks of modern architecture, simultaneously protects the content and allows to catch a glimpse of its interior. The generous dimensions and raffia confection make it ideal to withstand the transportation of large volumes and heavy loads. The incorporated laces enable the bag to be closed, if required. This model is outfitted with an interior pocket with zipper to keep your belongings under control.

 

design by Naïm Vilaseca & Mar Villegas

Quantity:
Add to Cart