Cylindrical Carrier Bag - Green

Cylindrical Carrier Bag - Green

78.00

Main parts: 100% polypropylene
Handle: 100% polypropylene
Cord: 100% cotton
Interior colour: green
Size: Ø 30 cm H 37 cm  

 

Singular and versatile. The carrier bag has been designed to make your everyday life more stylish and comfortable. The design, inspired by glass blocks of modern architecture, simultaneously protects the content and allows to catch a glimpse of its interior. The generous dimensions and raffia confection make it ideal to withstand the transportation of large volumes and heavy loads. The incorporated laces enable the bag to be closed, if required.

 

design by Naïm Vilaseca & Mar Villegas

Quantity:
Add to Cart