Pack: Large Green Base + Small Bisque Base

Pack: Large Green Base + Small Bisque Base

120.00

Large Base - Green
Material: lacquered DMF
Colour: green
Size: L 29,3 cm W 1,9 cm H 45 cm
+
Small Base - Bisque
Material: lacquered DMF
Colour: bisque
Size: L 29,3 cm W 1,9 cm H 30 cm

 

These geometric design bases inspired by architectural ceramic claddings are the ideal items to work as serving boards or presentation trays, yet they will be perfect to decorate your walls when not in use. The carvings on both sides of the boards and their lacquer-finished surface provide them with a silky soft touch.

 

Add To Cart