Pack: Large Grey Base + Small Green Base

Pack: Large Grey Base + Small Green Base

120.00

Large Base- Grey
Material: lacquered DMF
Colour: grey
Size: L 29,3 cm W 1,9 cm H 45 cm
+
Small Base - Green
Material: lacquered DMF
Colour: green
Size: L 29,3 cm W 1,9 cm H 30 cm

 

These geometric design bases inspired by architectural ceramic claddings are the ideal items to work as serving boards or presentation trays, yet they will be perfect to decorate your walls when not in use. The carvings on both sides of the boards and their lacquer-finished surface provide them with a silky soft touch.

 

Add to Cart