Small Base - Grey

Small Base - Grey

57.00

Material: lacquered DMF
Colour: grey
Size: L 29,3 cm W 1,9 cm H 30 cm

 

This geometric design base inspired by architectural ceramic claddings is the ideal item to work as serving board or presentation tray, yet it will be perfect to decorate your walls when not in use. The carvings on both sides of the board and its lacquer-finished surface provide it with a silky soft touch. The geometric shape makes it easy to combine with other bases of the collection, which are available in different sizes and colours.

 

Quantity:
Add to Cart